List of Charges for Use of Port Facility at the Port of Hakata(as of 1 May 2026)
Regulations of Hakata Port Facility Management
General/Special Use
Use for Other Purposes
Regulations of Port Dues at the Port of Hakata
Regulations of Hakata Port International Terminal
In accordance with consumption tax law, 10% consumption tax shall be imposed separately on the rate stated in the list.
Regulations of Hakata Port Facility Management
General/Special Use
Berth and Landing Stage
| Classification |
Mooring Hours |
Rate(Unit:Yen) |
| Per GT |
Berths for large vessels
(over 6 meters in depth) |
less than 2h |
6.1 |
| 2 -12h |
9.15 |
| over 12 - 24h |
12.2 |
| over 24h |
*For moorage of more than 24h, \6.10/GT is additionally charged for every 12h. |
Berths for small vessels
(less than 6 meters in depth)
(including Landing Stage : less than -4.5 meters in depth) |
less than 2h |
4.8 |
| 2 -12h |
5.85 |
| over 12 - 24h |
6.9 |
| over 24h |
*For moorage of more than 24h, \3.45/GT is additionally charged for every 12h. |
Pontoon
| Classification |
Mooring Hours |
Rate(Unit:Yen) |
| Per GT |
less than 2h |
6.1 |
| 2 -12h |
9.15 |
| over 12 - 24h |
12.2 |
| over 24h |
*For moorage of more than 24h, \6.10/GT is additionally charged for every 12h. |
Mobile Bridge for Car Ferries
| Classification |
Rate (Unit:Yen) |
| Per moorage |
3,200 |
Dolphin
| Classification |
Gross Tonnage |
Rate (Unit:Yen) |
| For each 24h moorage |
Vessels of less than 1,000GT |
5,000 |
| Vessels from 1,000 to less than 3,000GT |
10,000 |
| Vessels from 3,000 to less than 5,000GT |
14,900 |
| Vessels from 5,000 to less than 10,000GT |
22,300 |
| Vessels from 10,000 to less than 15,000GT |
37,200 |
| Vessels of 15,000GT and over |
44,600 |
Tour Bus Parking for Cruise Passengers
| Classification |
Rate(Unit:Yen) |
| Per bus/day |
2,000 |
Transit Shed
| Classification |
Storage Period |
Rate(Unit:Yen) |
Per m2/day
(General Use) |
1-15 days
No foreign trade cargo is charged for the first three days. |
7.1 |
| 16 - 30 days |
15.3 |
| 31 days and over |
38 |
Per m2/month
(Special Use) |
- |
200 |
Office Attached to Transit Shed
| Classification |
Rate(Unit:Yen) |
| Per m2/month (Special Use) |
615 |
Fruit and Vegetable Shed
| Classification |
Rate(Unit:Yen) |
| Per month (Special Use) |
8,069,000 |
Domestic Trade Container Shed
| Classification |
Rate(Unit:Yen) |
| Per month (Special Use) |
2,200,000 |
Foreign Trade Container Shed
| Classification |
Rate(Unit:Yen) |
| Per month (Special Use) |
2,100,000 |
Ro/Ro Cargo Shed
| Classification |
Rate(Unit:Yen) |
| Per month (Special Use) |
1,987,000 |
Administration Building
| Classification |
Period |
Rate(Unit:Yen) |
| Meeting room |
Per hour |
1,700 |
| Office |
Per m2/month (Special Use) |
1,900 |
| Gate Facility |
Per month (Special Use) |
300,000 |
| Others |
Per m2/month (Special Use) |
2,000 |
Inspection Facility
| Classification |
Rate(Unit:Yen) |
| Per inspection per container |
1,000 |
Maintenance and Repair Facility
| Classification |
Rate(Unit:Yen) |
| Per month (Special Use) |
961,400 |
Freight Sorting Yard
| Classification |
Period |
Rate(Unit:Yen) |
Per m2/day
(General Use) |
Paved area |
1 - 15 days |
5.5 |
| 16 - 30 days |
11.1 |
| 31 days and over |
22 |
| Unpaved area |
1 - 15 days |
2.8 |
| 16 - 30 days |
5.1 |
| 31 days and over |
10.2 |
Per m2/month
(Special Use) |
Paved area |
- |
127 |
| Unpaved area |
- |
71 |
Cargo Handling Equipment for Grain and Attached Facility
| Classification |
Rate(Unit:Yen) |
| Per set of 5 equipments per month(Special Use) |
13,600,000 |
Gantry Crane
| Classification |
Rate(Unit:Yen) |
| Per crane/30min |
26,000 |
a)The charge is reduced to 23,000yen/30min on Sunday when vessels that regularly undergo cargo handling activities on Sunday.
b)1,200yen is subtracted from the charge of each transshipment cargo per use.
Reefer Plug
| Classification |
Rate(Unit:Yen) |
| Per plug/hour |
120 |
Open Storage Yard
| Classification |
Storage Period |
Rate(Unit:Yen) |
| Per m2/day (General Use) |
Paved Area |
1 - 15 days |
5.5 |
| 16 - 30 days |
11.1 |
| 31 days and over |
22 |
| Unpaved Area |
1 - 15 days |
2.8 |
| 16 - 30 days |
5.1 |
| 31 days and over |
10.2 |
| Per m2/month (Special Use) |
Paved Area |
|
127 |
| Unpaved Area |
|
71 |
| Mayor-designated Area |
|
102 |
Multistory Automobile Storage Facility
| Classification |
Rate (Unit:Yen) |
| Per month (Special Use) |
11,500,000 |
Timber Basin
| Classification |
Storage Period |
Rate (Unit:Yen) |
| Per m2/day (General Use) |
1 - 45 days |
0.7 |
| 46 days and over |
1.1 |
| Per m2/month (Special Use) |
Type 1 |
9 |
| Type 2 |
12 |
Water Supply Facility at Berth
| Classification |
Rate (Unit:Yen) |
| In the case of bad weather or out of office hours, 50% of the charge will be added. |
Up to 3t |
2,190 |
| Per ton for over 3t |
730 |
Port Facility Site
| Classification |
Rate (Unit:Yen) |
| Cranes |
Per crane per month |
For boom length of less than 7m |
2,700 |
| For boom length of over 7m |
4,000 |
| Others |
Per m2/month |
161 |
Passenger Terminal at Hakata Wharf and Attached Facility
| Classification |
Rate (Unit:Yen) |
| Per month (Special Use) |
1,800,000 |
Use for Other Purposes
Transit Shed
| Classification |
Rate (Unit:Yen) |
| Per m2/month |
615 |
Freight Sorting Yard and Open Storage Yard
| Classification |
Rate (Unit:Yen) |
| Per m2/month (In the case of installment of utility poles and pipes etc., the regulations of road utilization charges of Fukuoka City shall be applied and the rate shall be calculated accordingly.) |
Paved Area |
191 |
| Unpaved Area |
118 |
Timber Basin
| Classification |
Rate (Unit:Yen) |
| Per m2/month |
20 |
Port Facility Site
| Classification |
Rate (Unit:Yen) |
| Per m2/month (In the case of installment of utility poles and pipes etc., the regulations of road utilization charges of Fukuoka City shall be applied and the rate shall be calculated accordingly.) |
Site for Sheds and Warehouses |
241 |
| Shed Rooftop |
80 |
| Other Sites |
Paved Area |
214 |
| Unpaved Area |
133 |
Harbour Road Site
| Rate |
| The regulations of road utilization charges of Fukuoka City shall be applied and the rate shall be calculated accordingly. |
Regulations of Port Dues at the Port of Hakata
Port Dues
| Classification |
Rate (Unit:Yen) |
| Per GT (No vessel of less than 700GT is charged.) |
International service |
2.60 |
| Domestic service |
1.30 |
Note: 50% of the charge (\1.30/GT) is discounted for international liners.
Regulations of Hakata Port International Terminal
Hakata Port International Terminal
General/Special Use
| Classification |
Rate
(Unit:Yen) |
| Terminal Charge |
Per person on embarkation |
6 -11 years old |
250 |
| 12 years old and over |
500 |
| Inspection facility and terminal for international passengers |
Per use |
3,500 |
| Boarding Bridge |
Per equipment per day |
35,000 |
| Baggage Office |
Per hour |
406 |
| Baggage Room |
Per room per hour |
6,100 |
| Freight Sorting Yard |
Per room per day |
4,200 |
| Per room per hour |
530 |
| Terminal Hall |
(RoomA/B)
Per room |
Up to 1h |
20,000 |
| over 1 - 3h |
30,000 |
| over 3 - 5h |
40,000 |
| Over 5h |
60,000 |
| Meeting Room |
Per room |
Up to 1h |
20,000 |
| over 1 - 3h |
30,000 |
| over 3 - 5h |
40,000 |
| Over 5h |
60,000 |
| Special Reception Room |
Per room |
Up to 1h |
5,200 |
| over 1 - 3h |
10,400 |
| over 3 - 5h |
15,600 |
| Over 5h |
26,000 |
| Waiting Room |
Per room per hour |
320 |
| Car Parking |
Per car per use |
Every 30 min |
100 |
| Over 4.5 - 24h |
1,000 |
| Over 24h |
For use of more than 24h, 1,000yen is charged every 24h and the rate for less than 24h is calculated accordingly as stated above |
| Office |
Per m2/month |
In the case of utilization by national or local authorities |
1,750 |
| Others |
2,000 |
| Shop |
Per m2/month |
Type 1 |
3,000 |
| Type 2 |
2,000 |
| Warehouse |
Per m2/month |
2,000 |
| Car Parking for Business Use |
Per car/month (Exclusive of buses) |
15,800 |
| Electric Bulletin Board |
Per board per month. [In the case of commercial use by those who do not have permission for special use (exclusive of electric bulletin board use only), double rates shall be charged.] |
12,000 |
Note: Double rates shall be charged in case users of the terminal charge admission fee.
Special Use
| Classification |
Rate
(Unit:Yen) |
| Observation Deck |
Per m2/month |
280 |
| Per m2/day |
28 |
| Indoors |
In the case of commercial use by those who do not have permission for special use (exclusive of electric bulletin board use only), tenfold rates shall be charged. |
Floors |
Per m2/month |
2,000 |
| Per m2/day |
200 |
| Walls |
Per m2/month |
1,000 |
| Per m2/day |
100 |
Outdoors
(Exclusive of observation deck) |
In the case of installment of utility poles and pipes etc., the regulations of road utilization charge of Fukuoka City shall be applied and the rate shall be calculated accordingly. |
Per m2/month |
560 |
| Per m2/day |
56 |
Inquiries for Other Charges
| Pilotage |
Hakata Pilot Association |
TEL:092-291-4494 |
| Tuggage |
Hakata Port Towage Cooperative |
TEL:092-674-4600 |
| Line handling |
Hakata Port Service Center |
TEL:092-641-8831 |